Carnegie Swim Centre Redevelopment

Share on Facebook Share on Twitter Share on Linkedin Email this link

Feedback on the draft concept designs is now closed. Thank you to everyone who provided feedback via our online survey or who attended our Community Information Webinar.

We’re currently halfway through the concept design phase. The concept design establishes the floor plan for the centre — which is within the footprint of the current site — and is where we explore options for the size of key spaces, movement through the site, scale and form of buildings and general layout.

At this stage, landscaping is indicative – a concept only.

Once endorsed by Council, the process will move to the schematic design phase, where the selected concept is further refined and finalised through materials, colours, landscaping and finishes.

The concept plans for Carnegie Swim Centre includes:

  • an outdoor 50 metre, eight lanepool;
  • an outdoor diving pool;
  • an indoor warm water program pool and 25 metre learn-to-swim pool;
  • a concourse spa;
  • indoor sauna, steam room and accessible changerooms;
  • indoor program rooms;
  • consultancy rooms;
  • a café;
  • outdoor children’s splash pad/water play;
  • lawn areas and open spaces (including retention of the eastern mound);
  • barbeques and shaded seating; and
  • the retention of character and local charm.

Council has also engaged traffic engineers to conduct a study on traffic and parking impacts on the surrounding area. This report is available in the Document Library.

The redevelopment of Carnegie Swim Centre is an important project that will boost the local economy and provide many jobs. A redeveloped Centre will also improve the general experience for users, support opportunities to enhance community feel and connectedness, and will ensure that the Centre remains environmentally sustainable. We are planning now so that Carnegie Swim Centre can meet the needs of the growing community for years to come.

The project is estimated to be completed by early 2023.

For further information email projects@gleneira.vic.gov.au or call 9524 3333.

Feedback on the draft concept designs is now closed. Thank you to everyone who provided feedback via our online survey or who attended our Community Information Webinar.

We’re currently halfway through the concept design phase. The concept design establishes the floor plan for the centre — which is within the footprint of the current site — and is where we explore options for the size of key spaces, movement through the site, scale and form of buildings and general layout.

At this stage, landscaping is indicative – a concept only.

Once endorsed by Council, the process will move to the schematic design phase, where the selected concept is further refined and finalised through materials, colours, landscaping and finishes.

The concept plans for Carnegie Swim Centre includes:

  • an outdoor 50 metre, eight lanepool;
  • an outdoor diving pool;
  • an indoor warm water program pool and 25 metre learn-to-swim pool;
  • a concourse spa;
  • indoor sauna, steam room and accessible changerooms;
  • indoor program rooms;
  • consultancy rooms;
  • a café;
  • outdoor children’s splash pad/water play;
  • lawn areas and open spaces (including retention of the eastern mound);
  • barbeques and shaded seating; and
  • the retention of character and local charm.

Council has also engaged traffic engineers to conduct a study on traffic and parking impacts on the surrounding area. This report is available in the Document Library.

The redevelopment of Carnegie Swim Centre is an important project that will boost the local economy and provide many jobs. A redeveloped Centre will also improve the general experience for users, support opportunities to enhance community feel and connectedness, and will ensure that the Centre remains environmentally sustainable. We are planning now so that Carnegie Swim Centre can meet the needs of the growing community for years to come.

The project is estimated to be completed by early 2023.

For further information email projects@gleneira.vic.gov.au or call 9524 3333.

  • We Asked - You Said - We Did

    Share on Facebook Share on Twitter Share on Linkedin Email this link
    04 May, 2020

    Carnegie Swim Centre is a much-loved part of Glen Eira where many memories have been made for more than 50 years.

    At a recent Council meeting, Council endorsed a redevelopment option to commence concept design for the new Carnegie Swim Centre.

    The endorsed option, Option B, includes the retention of the existing embankment and an upgrade of the existing 50 metre pool that acknowledges the nostalgia of this iconic space, with the addition of indoor pools to respond to community need.

    Also included arean indoor sauna and steam room, accessible changerooms, two program rooms (not a gym), outdoor children’s water play, barbeques and shaded seating areas.

    Council resolved in October 2019 to consult with the community on three proposed redevelopment options for the Carnegie Swim Centre, which were:

    Option A: Redeveloped swim centre with indoor and outdoor pools and beach volleyball.

    Option B: Redeveloped swim centre with indoor and outdoor pools and an outdoor diving pool.

    Option C: Close existing swim centre, re-establish open space and investigate options to extend Glen Eira Sports and Aquatic Centre (GESAC).

    For over 3 months, between mid-October 2019 and the end of January 2020, we consulted on these proposed options to gather feedback on preferences from the community. The engagement process included a short survey to select a preferred redevelopment option, as well as opportunity to provide comments and any other feedback.

    Over 1,300 responses were received, reflecting Option B as the most popular with almost 74% of the vote from the community.

    Of the 792 written comments submitted, 96% of responses were positive in support of redevelopment. Only 4% of responses were opposed to any redevelopment.

    Some of the themes arising from the consultation were:

    • Make the redeveloped centre a year-round facility
    • Ensure a sustainable, energy efficient and climate sensitive centre
    • Accessible and inclusive for all ages and abilities
    • Keep entry cost affordable
    • Retain all open space

    Historical sentiment was also raised as being important to the community, honouring the memorial pool and the acknowledgement of those who served in the world wars was strongly valued. Closely linked to this was the desire to uphold the sense of nostalgia which the current facility evokes.

    Traffic and parking were also clear themes, including the impact on traffic if the proposed closure of Moira Avenue was to proceed.

    The next step in the process will be preparing the concept design and a further stage of community consultation. This will seek feedback on the proposed concept design, as well as the traffic and parking analysis for the proposed redevelopment, including the impacts of closing Moira Avenue.

    An architect and specialist design team have been appointed and will be engaging with the Community Reference Group, as well as using the valuable feedback gathered through the community engagement, to inform the concept design in preparation for the next phase of consultation.